Polly po-cket
Home
57 year old Fashion Designer Carter Mosby from Manitouwadge, has hobbies and interests for instance bridge, asphalt plant and camping. During the previous year has completed a visit to Hoi An Ancient Town.

What advanced functions does the control system of asphalt mixing station have?

When the inspection is complete, make sure there are no abnormalities, and then we need to use automatic control to test the mixing building in the entire asphalt mixing station.
At the same time, it is necessary to focus and correct the accuracy of the weighing system.
Finally, it is necessary to complete the screening test and grading design of the aggregate, and can be tested to produce a bit, if found qualified, then you can put into normal production.

Asphalt mixer Commutator valve failure is not complex, that is, the conversion is not timely, gas leakage, electromagnetic pilot valve failure and so on, the corresponding reasons and solutions are of course different.
In order to change the commutative valve is not timely phenomenon, generally because of poor smoothness, spring jammed or damaged, oil or impurities stuck in the sliding part, etc., it is necessary to check the status of the oil mist, lubricating oil viscosity, the need to replace lubricating oil or other parts.

In short, for the work and management of asphalt mixing plant, we need to pay more attention to, as a staff, we must follow the corresponding rules and regulations to carry out production work, to ensure the successful completion of the task.

Therefore, for the present situation, we must find a development plan that is in line with China's national conditions as soon as possible, and also need to work out a set of suitable production standards as soon as possible.
In this way, China's independent innovation results can be turned into a competitive advantage in international trade.
In addition, it is necessary to continuously strengthen the research work of asphalt mixing station, and quickly improve the technology and production level.

However, in the actual work, for the ratio of raw materials many users do not have a wealth of reliable experience.
And in the asphalt mixing station work, for the raw material matching scheme is not static, need to be adjusted according to various circumstances, so, in the matching work, what to measure?

After a long period of use, the commutator valve is prone to valve core seal ring wear, stem and seat damage phenomenon, resulting in gas leakage in the valve.
At this point, the seal ring, stem and seat should be replaced, or the commutator valve should be changed directly for new.
In order to reduce the failure rate of asphalt mixer, usually also need to strengthen maintenance.

We should understand that the ratio of raw materials is one of the most important and basic things in the working process of asphalt mixing station, which should take into account the actual materials used, including the stirring method of Asphalt Mixing Plants and other factors, and finally in the determination.
This is because, different materials or different mixing methods, the corresponding matching scheme will have a difference, therefore, the best solution is according to the calculation ratio to carry out the ratio.
In addition, the properties of the material, such as the adhesion requirements, should also be taken into account, and we can do so by adjusting the amount of water and sand rate until the mixture meets the requirements of the construction.

First, it is necessary to choose the equipment that matches the construction requirements in order to ensure the smooth running of the work.
For example, to ensure that the selection of suitable asphalt mixing station requirements of the conveyor pump, at the same time must meet the unit time of the maximum asphalt pouring requirements and the highest height, the maximum horizontal distance requirements.

So, under this new situation, China's asphalt mixing station equipment in the face of export problems should be taken what measures? For this problem, we have to upgrade the technical level, expand the scale of production, the other side also needs to retrofit the asphalt mixing station equipment heating system, effectively improve the market competitiveness of products.

After the test pressure is over, we should also arrange for the staff to carry out comprehensive maintenance of the mixing building in the asphalt mixing station.
At the same time, the power supply and control system should also be checked for reliability.
This is to ensure that the construction work can be successfully offset in the future work.
Then turn on the power supply, the mechanical parts are commissioning in a point-controlled manner to see if there is an abnormal problem, and to check that the motor steering is correct.

In the use of asphalt mixer, the user must seriously consider the question of how the ratio of raw materials should be carried out.
Asphalt mixer is an important equipment of asphalt mixing station, and its working condition will affect the whole construction situation.
Therefore, for this issue, users must take it seriously.

After a period of development, China's Chinese asphalt mixing station equipment in the production technology and other aspects of a certain improvement.
At present, we can basically meet the needs of China's use, so we hope to be able to build on this to further expand the market, towards the international.
Today's main want to introduce to you is about China's asphalt mixing station equipment export problems and strategies.
Back to posts
This post has no comments - be the first one!

UNDER MAINTENANCE