Influencing factors of equipment in production of asphalt mixing station

In practice, it has been found that in many cases we encounter the problem that when using asphalt mixing stations, its control system is often subject to some interference.
So, in order to avoid the effects of these disturbances, we have also taken a number of methods, such as grounding, isolation, the use of twisted-pair lines and so on.
Today, the main introduction is the first method.

8, solenoid valve: Also known as electromagnetic commutator valve, Chongqing asphalt Concrete Mixing station by changing the direction of high-pressure gas to promote the piston movement in the cylinder.

Asphalt mixing station under the action of drying materials, the equipment will appear violent tremors occurred, which will directly lead to the gap between the wheel and rail and the wheel adjustment of the situation occurred, or the two sides of the position of the deviation of the situation, Therefore, the operator needs to add grease to the position of the surface contact between the wheel and the school wheel rail after the daily operation.

According to normal conditions, in order to ensure the quality of the project, a project only allows the establishment of an asphalt mixing station, or according to the zoning of the mixing station, can also be set up a large mixing station and then with the appropriate amount of concrete conveyor, these can be adjusted according to the actual situation.
Each mixing station should then be equipped with one to two pools, which is to protect the concrete mixing in the operation and the water requirements for mechanical cleaning work.

The last way is called lightning protection grounding, if subdivided, it can also be divided into two ways, the specific content is: 1, for the laying of signal lines metal cable pipe or groove surface grounding, can prevent coupling interference; 2, if the asphalt mixing station control system is overhead signal line, need to take lightning protection measures at the computer input terminal, Inhibits interference.

In fact, do a good job in the asphalt mixing station equipment maintenance and management, not only can properly extend the service life of the equipment, but also can more effectively ensure the smooth running of the entire production work, but also for the production enterprises to save costs and improve economic efficiency.

The second way is the power supply system grounding, this grounding method still has a lot of benefits.
In the basic installation, the manufacturer will first prepare a foundation map, and then according to the requirements of this diagram layout of a large ground network, most of the time, the entire asphalt mixing station control system is connected with this ground network, is not directly using the power system of the ground line.

Asphalt Mixing Plant disassembly is a relatively large and complex process, equipment before disassembly needs to be based on its location and the actual situation to develop a plan can be implemented, and then all the disassembly personnel need to carry out a comprehensive technical and safety exchange, equipment before disassembly needs to do a good job of equipment accessories and appearance of the inspection registration record work.

In the actual disassembly, it is important to note that it must be carried out in accordance with the requirements of the program.
For example, care should be taken not to cut wires, cables, and before removing the cable also need to carry out three control, respectively, the internal line number, terminal plate number, external line number.
After these confirmations, the asphalt mixing station can be disassembled as required.
Otherwise, appropriate adjustments will be required so as not to result in losses.

While adding grease, it is also necessary to pay attention to adjust the tightness of the fixed nut in time, and then make an effective adjustment between the wheel and the gap between the school wheel and rail, so as to ensure that the two can be run smoothly, in the contact point will be more uniform force.
In this way, the Asphalt Batch Mix Plant mixing station in the operation of the time will not appear any obstacles.

In the process of disassembly, in order to ensure that it can proceed normally, we need to do a good job of marking and marking.
Also, be sure to use special tools to operate, do not carry out destructive disassembly.
All disassembled bolts, nuts and positioning pins should be screwed back or inserted back into place immediately after oiling to avoid confusion and loss, affecting the normal use of asphalt mixing stations.

As a staff member, all removed parts need to be checked and cleaned, and it is best to do a good job of rust prevention.
After the disassembly work is completed, it should be stored reasonably according to the requirements, and the asphalt mixing station site clean up.

In the production of asphalt mixing station, which often contains a number of different production links, and often have a very close relationship.
Therefore, if there is a link to the error, then it may affect the final quality of production.
Next, we will make a brief introduction to the impact of the equipment on the production of asphalt mixing station, I hope to help.